SGC340/400/440/490/570 Galvanized Steel Wire
Galvanized wire is processed from high-quality low-carbon steel wire rod, which is formed by drawing, acid washing, rust removal, high-temperature annealing, and hot-dip galvanizing. It is processed through cooling and other technological processes. Galvanized wire is divided into hot-dip galvanized wire and cold dip galvanized wire (electroplated zinc wire).
+8618654573180
sales01@tsingtuosteel.com
Contact us

◉ Product Details

NameGalvanized iron     wire
Size rangeBWG8   - BWG 26
Zinc coat30-280g/m2
Tensile   strength350-550N/mm2
Elongation10%
Surface   treatmentPVC   coated.electro or   hot dipped galvanized
Packing

1.LCL:packed     with plastic film then on the pallets           2.FCL:Nude packing

    3.Other special package according   to customers' requirements.
Delivery TimeNormally 7-15 days after   receipt of deposit.
Brand Nameoriental   flourish
Model Numbergalvanized   iron wire
Surface   Treatmentgalvanized
TypeRound   wire
Processing   ServiceWelding.     Bending.Cutting
Product nameGalvaized   Iron Wire
MaterialLow   Carbon Steel   Q195.sea 1008
ApplicationBuilding   Material
SurfaceGalvanised   Zinc
ColorSliver
Coil weight1kg-1000kgs/coil
Wire GaugeBWG8-BWG26
PackageCustomers   Request
    KeywordGllavanized   Iron Wire   Bwg21
Wire diameterBWG26-BWG8(0.45mm-4mm) or as required

◉ Product Show

Galvanized ironwire.jpg

◉ Product Application

galvanized.jpg

◉ Packing And Shipping

wire.jpg

◉ Factory Show

  • 15.jpg
  • 6.jpg
  • 33.JPG
  • 13.jpg
  • 8.jpg
  • 2.jpg

◉ FAQ

Q1: What is the minimum order quantity (MOQ)? Do you support sample ordering?

A: We provide flexible procurement solutions:
Regular orders: MOQ 5 tons (special materials such as high-strength alloy steel MOQ 3 tons)
Sample ordering: Free samples of ≤1 meter (limited to 2 materials), support freight to be paid;
Zero-cut service: Inventory spot supports retail cutting by meter/kilogram to meet R&D and testing needs.

Q2: What are the payment methods? What currencies are accepted for settlement?

A: We provide diversified financial solutions:
Standard payment: T/T (30% prepayment), LC
Cross-border settlement: Accept USD, EUR, CNH, and the exchange rate is locked according to the Bank of China's daily exchange rate

Q3: How to deal with damage to goods during transportation? Is it insured?

A: We implement full-process risk protection:
Purchase "Ping An Cargo Transportation Insurance" by default, with the insured amount covering 110% of the value of the goods
Take an unboxing video within 48 hours after arrival and apply for quick claims
Provide "hosted warehousing" service, and waive 30-day storage fees for delayed delivery

Q4: Can long-term cooperation get better prices?

A: We have launched a "ladder rebate plan":
Annual purchase amount reaches 300 tons: rebate 2% + free warehousing for 1 month;
Reach 1,000 tons: rebate 5% + exclusive steel mill direct sales price (8-12% lower than the market price);
Support price hedging: Signing an annual framework agreement can lock the floating range

Q5: How long is the delivery cycle?

A: Conventional products: shipped within 7 days
Customized products: 15-30 days
Express service: Paying 10% of the fee can shorten the time by 1/3

Q6: How to ensure quality? Is a test report provided?

A: According to customer requirements, each batch of goods can be accompanied by SGS/BV stamped reports. Support factory inspection

Contact us

Submit

◉ Product Recommendation